Belleli Energy sails through the new Valdaro Basin with an oversize load

Belleli Energy sails through the new Valdaro Basin with an oversize load

Mantua, August 24th, 2018. This date marks an historical milestone for Belleli Energy and for all the waterways in the Mantua area.

On this day, Belleli Energy successfully shipped through the new Valdaro Basin a Main Fractionator (main distillation column for refinery) with a total weight of 220 tons. The new basin directly connects the Mincio river with the Fissero-Tartaro channel (Canal Bianco), allowing to transport cargos of higher weight and size. The construction of the new river basin pairs with the “Nuvolari 1892” barge, that is being completed in Belleli Energy workshop. The Column rapidly and successfully sailed along the new basin and it is now directed to its final destination in Algiers (Algeria).

Belleli Energy is proud for the close collaboration with the Mantuan territory that led to the completion of this important connection hub, which official inauguration will take place on September 8th.